Airport Construction & Development

Airport Construction & Development

Airport Improvement Guidelines

Download PDF (Large File)

Current Projects

RUNWAY 16R-34L & EAST ALV IMPROVEMENTS (Reno-Tahoe)

Project Description:

Reconstruction of existing Runway 16R-34L concrete pavement, asphalt blast pads, and asphalt shoulders, replacement of runway approach lighting system, and east airfield lighting vault (ALV).

Current Phase:

RFQ Issued December 2017

Design Services Awarded:

TBD

Design Cost:

TBD

Design Constultant:

TBD

Sealed Proposals Opened:

TBD

Construction Cost:

TBD

Contractor:

TBD

Anticipated Completion Date:

TBD

 
AIRFIELD MAINTENANCE SHOP LARGE BAY EXPANSION (Reno-Tahoe)

Project Description:

Construction of an additional service bay to the existing RTIA Airfield Maintenance Facility to accommodate large ARFF, SRE, and AF Maintenance vehicles. The new bay is a high volume space and includes a bridge crane, related building systems, and specialty mechanic equipment.

Current Phase:

Program Study

Design Services Awarded:

January 2018 (Program Study Only)

Design Cost:

$25,000 (Program Study Only)

Design Constultant:

H+K Architects (Program Study Only)

Sealed Proposals Opened:

TBD

Construction Cost:

TBD

Contractor:

TBD

Scheduled Completion Date:

TBD

 
READY RETURN CAR WASH EQUIPMENT REPLACEMENT (Reno-Tahoe)

Project Description:

Replacement of five heavy duty top brush car wash systems, water storage tanks, radiant heating units, electrical distribution panels, and refinishing of the wash bay interior masonry.

Current Phase:

Design - RFQ - July 11, 2017

Design Services Awarded:

December 14, 2017

Design Cost:

$90,730

Design Constultant:

Petty & Associates

Sealed Proposals Opened:

TBD

Construction Cost:

$940,000 (estimated)

Contractor:

TBD

Anticipated Completion Date:

TBD

 
RENTAL CAR READY RETURN AREA RECONFIGURATION (Reno-Tahoe)

Project Description:

Reconfiguration of the existing Rental Car (RAC) Ready Return Area in the RTIA parking structure, consisting of, concrete driveway construction, signage, striping, and barricades.

Current Phase:

Design

Design Services Awarded:

TBD

Design Cost:

TBD

Design Constultant:

TBD

Sealed Proposals Opened:

TBD

Construction Cost:

TBD

Contractor:

TBD

Anticipated Completion Date:

TBD

 
RENTAL CAR REMOTE FACILITIES PAVEMENT RECONSTRUCTION (Reno-Tahoe)

Project Description:

Rehabilitation of Rental Car Facility asphalt parking lots at RTIA.

Current Phase:

Design

Design Services Awarded:

April 1, 2017

Design Cost:

$140,000

Design Constultant:

Lumos & Associates

Sealed Proposals Opened:

TBD

Construction Cost:

$2,100,000 (estimate)

Contractor:

TBD

Anticipated Completion Date:

TBD

 
RENTAL CAR NEW REMOTE PARKING LOT (Reno-Tahoe)

Project Description:

Construction of a new 78,000 SF asphalt parking lot at the Rental Car Remote Facility at RTIA.

Current Phase:

Design

Design Services Awarded:

TBD

Design Cost:

$70,000 (estimate)

Design Constultant:

TBD

Sealed Proposals Opened:

TBD

Construction Cost:

$770,000 (estimate)

Contractor:

TBD

Anticipated Completion Date:

TBD

 

TERMINAL ELEVATOR MODERNIZATION AND NEW ELEVATOR INSTALLATION (Reno-Tahoe)

Project Description:

Modernization of four (4) existing elevators and construct one (1) new elevator in RTIA Terminal Building.

Current Phase:

Program Study

Design Services Awarded:

TBD

Design Cost:

TBD

Design Constultant:

TBD

Sealed Proposals Opened:

TBD

Construction Cost:

TBD

Contractor:

TBD

Anticipated Completion Date:

TBD

 
800 MHz RADIO SYSTEM - PHASE 2 (Reno-Tahoe)

Project Description:

Installation of Bi-directional Amplifiers (BDA) and Distributed Antenna System (DAS) for the existing 800 MHz radio system in the RTIA Terminal Building and Concourses.

Current Phase:

Construction

Design Services Awarded:

December 14, 2016

Design Cost:

$11,000 (estimate)

Design Constultant:

Galena Group

Sealed Proposals Opened:

August 15, 2017

Construction Cost:

$149,905

Contractor:

Sierra Electronics

Anticipated Completion Date:

March 18, 2018

 
TERMINAL MINI-WAREHOUSE ASPHALT REHABILITATION (Reno-Tahoe)

Project Description:

Reconstruction of existing asphalt pavement and storm drain improvements for the Airport Terminal Mini Warehouse (TMW) AA/BB/CC areas.

Current Phase:

Design

Design Services Awarded:

Pending

Design Cost:

$50,000

Design Constultant:

Kimley-Horn and Associates

Sealed Proposals Opened:

TBD

Construction Cost:

$430,000 (estimate)

Contractor:

TBD

Anticipated Completion Date:

TBD

 
TSA OPERATIONS SPACE IMPROVEMENTS (Reno-Tahoe)

Project Description:

Remodel of existing TSA Operations space at RTIA.

Current Phase:

Program Study

Design Services Awarded:

October 24, 2017

Design Cost:

$9,100 (Program Study Only)

Design Constultant:

Paul Cavin Architect LLC

Sealed Proposals Opened:

TBD

Construction Cost:

TBD

Contractor:

TBD

Anticipated Completion Date:

TBD

 
COMMUNICATION LINE REPLACEMENT (Reno-Tahoe)

Project Description:

Design and relocation of existing communication lines in the area of north ground transportation.

Current Phase:

Design

Design Services Awarded:

 

Design Cost:

$50,000

Design Constultant:

PK Electrical

Sealed Proposals Opened:

TBD

Construction Cost:

TBD

Contractor:

TBD

Anticipated Completion Date:

TBD

 

PURCHASING OFFICE RELOCATION (Reno-Tahoe)

Project Description:

Remodel existing AVA facility for RTAA Purchasing Office relocation.

Current Phase:

Design

Design Services Awarded:

August 31, 2017

Design Cost:

$17,350

Design Constultant:

Architects+ LLC

Sealed Proposals Opened:

TBD

Construction Cost:

$63,000

Contractor:

TBD

Anticipated Completion Date:

TBD

 
GATE 170 ACCESS ROAD RECONSTRUCTION (Reno-Tahoe)

Project Description:

Reconstruction of the Gate 170 access road asphalt pavement at RTIA.

Current Phase:

Design

Design Services Awarded:

September 5, 2017

Design Cost:

$30,000

Design Constultant:

Dyer Engineering Consultants, Inc.

Sealed Proposals Opened:

March 2018 (TBD)

Construction Cost:

$236,000 (estimate)

Contractor:

TBD

Anticipated Completion Date:

TBD

 
MICROWAVE RADIO COMMUNICATION EQUIPMENT - NOC (Reno-Tahoe)

Project Description:

Removal of existing communication equipment in existing equipment cabinet, and existing radio system components, installation of new microwave radio system components compatible with P-25 Phase II digital radio standard.

Current Phase:

Construction

Design Services Awarded:

 

Design Cost:

 

Design Constultant:

 

Sealed Proposals Opened:

 

Construction Cost:

$179,825

Contractor:

Tech Connect

Anticipated Completion Date:

TBD

 
AIRPORT PAVEMENT MANAGEMENT PROGRAM (Reno-Tahoe and Reno-Stead)

Project Description:

Pavement inspections, evaluation, data base management, recommendations for repair and reconstruction, and cost estimates for airfield and landside pavements at Reno-Tahoe and Reno-Stead Airports.

Current Phase:

RFQ issued December 2017

Design Services Awarded:

TBD

Design Cost:

TBD

Design Constultant:

TBD

Sealed Proposals Opened:

TBD

Construction Cost:

TBD

Contractor:

TBD

Anticipated Completion Date:

TBD

 

AIRCRAFT PARKING APRON - CONCRETE PADS (Reno-Stead)

Project Description:

Removal of existing asphalt pavement and construction of 7,500 square yards of concrete pads for aircraft parking.

Current Phase:

Construction - Spring 2018

Design Services Awarded:

May 24, 2016

Design Cost:

$224,000

Design Constultant:

Dyer Engineering Consultants, Inc.

Sealed Proposals Opened:

January 26, 2017

Construction Cost:

$2,465,055

Contractor:

Q&D Construction

Anticipated Completion Date:

Summer 2018

 

RUNWAY 8-26 RECONSTRUCTION (Reno-Stead)

Project Description:

Reconstruction of 126,800 square yards of existing asphalt runway, including demolition, excavation, stabilized fill, pavement, drainage, utilities, electrical, signage and markings.

Current Phase:

Design (Construction to start March 5, 2018)

Design Services Awarded:

March 15, 2017

Design Cost:

$1,519,500

Design Constultant:

Wood Rodgers

Sealed Proposals Opened:

January 18, 2018

Construction Cost:

$15,120,120

Contractor:

Road and Highway Builders

Anticipated Completion Date:

October 20, 2018 (*Runway expected to be open for Air Races)

 

TERMINAL ACCESS ROAD REHABILITATION (Reno-Stead)

Project Description:

Reconstruction of approximately 1,000 linear feet of two lane road, construction of 50 space asphalt parking lot, and storm drain improvements.

Current Phase:

Design

Design Services Awarded:

Pending

Design Cost:

TBD

Design Constultant:

NCE

Sealed Proposals Opened:

TBD

Construction Cost:

$1,360,000 (estimate)

Contractor:

TBD

Anticipated Completion Date:

TBD

 